Savings in vehicle operating cost to the tune of Rs.100 crores per annum due to reduction in congestion in the existing roads and lower vehicle operating cost on the bridge.
Considerable savings in travel time due to increased speed and reduced delays at intersections at existing roads.
Ease in driving with reduced mental tension and overall improvement in the quality of life.
Improvement in environment especially in terms of reduction in carbon monoxide, oxides of nitrogen and reduction in noise pollution in areas of Mahim, Dadar, Prabhadevi and Worli.
Project to have no adverse effect on fisheries, marine life and livelihood of fisherman.
Reduced accidents.
Proper landscaping measures along the approaches and promenade along waterfront to enhance environment of the area.